info@ibctotespickup.com
Buying guide · 23 October 2025

A specification procurement can use

Municipal and institutional buyers have to specify what they are buying in words a competitor cannot game. Most tote specifications we see are either unbuildably vague or accidentally single-source. Here is a template that is neither.

Sheet
05
Revision
2026-10
Scale
1:1
Drawn at
Peoria IL
8Clauses that matter
3That backfire
18Checks to cite
0Grading authorities
Lead the loopGot a container question of your own?A grader answers in writing, usually the same business day.
A mailbox you actually read — the quote comes by email.
US or Canada only, 10 digits — for example (309) 555-0137.
Two letters, US or Canada.
US ZIP (61615) or Canadian (M5V 2T6).

We only use this to quote your totes. No lists, no resale, no robo-calls. Fields marked * are required.

There is no national grading authority for used IBCs, which means 'Grade A' in a bid document is legally meaningless. A specification has to describe the container, not name a letter, or you will receive exactly what the cheapest bidder decides the letter means.

The eight clauses worth writing

  1. Construction and marking: 'Composite IBC, UN design type 31HA1, packing group Y or better, marking fully legible and photographed at the time of quote.' This single clause eliminates most of the bad end of the market.
  2. Capacity and footprint, with the tolerance you can actually accept: '275 US gallon nominal, 48 × 40 in footprint, overall height not exceeding 48 in.'
  3. Bottle condition, described rather than graded: 'No stress whitening or crazing at corners or sump; no deformation of the sump seat; walls free of bulging; staining permitted.'
  4. Cleaning: 'Triple-rinsed minimum, with a cleaning record stating cycle type, temperature, duration and operator. Food contact requires a potable final rinse and a laboratory verification result.'
  5. Last contents: 'Documented last-contents declaration naming product and concentration. Containers with undocumented history are not acceptable.'
  6. Hardware: '2 in outlet valve, EPDM seat, new or verified-functional; 6 in buttress cap, vented or solid as specified; new gaskets throughout.'
  7. Pallet: specify the type and why. 'Composite or full steel pallet; wood pallets not acceptable' is a legitimate requirement in a washdown environment.
  8. Remedy: 'Containers not meeting this specification on delivery shall be replaced or credited at the supplier's cost, without requiring an inspection report from the purchaser.'

The three clauses that backfire

Backfires 01

'Grade A only'

Undefined industry-wide, so it either excludes everybody honest or includes everybody dishonest. Describe the condition instead and you will get what you wanted at a Grade B price, because Grade B is often exactly what the description allows.

Backfires 02

'Food grade' without the documents

This is the clause that generates the most disputes in public procurement. If you need food contact, specify the four documents: resin certification, contents history, validated cleaning with cycle detail, lab verification. If you do not need food contact, do not write the words.

Backfires 03

'Like new condition'

If you want new, specify new and pay for it. Asking for a used container in like-new condition is how a bid ends up single-source, over budget, or awarded to whoever is most relaxed about language.

We lose bids to vaguer specifications regularly, and we would rather that than win one by interpreting a loose clause generously. Three municipal customers have taken our published grading standard and cited it directly in their specifications, which is a legitimate and common approach — and we would say the same about any reconditioner who publishes theirs.

What to require in the bid response

  • Photographs of the actual containers being offered, including the UN plate, not stock images.
  • A sample cleaning record from the supplier's own process, with the fields filled in.
  • A written statement of their grading criteria, so the award can be compared on something.
  • Record retention period, and whether the purchaser may audit on site.
  • The remedy clause accepted explicitly rather than 'noted'.
  • For sustainability reporting: diversion methodology and the figures, with their basis stated.

Writing a bid now?

Ask for the municipal packet: specifications, grade definitions, diversion methodology and the avoided-emissions figures with sources, in a format that drops into a bid document.

Municipal & utilities →